Hood Canal Bridge Closure 2025. Massive hydraulic systems lift, retract and extend the driving surface of the bridge. It will be closed during the same hours from aug.


Hood Canal Bridge Closure 2025

Under what weather conditions will the hood canal bridge close? On sr 104 a hood canal bridge closure has been scheduled for approximately 8:45 am on tuesday june 11 for boat traffic.

Drivers Can Expect Delays Of.

Traffic management centers and washington state ferries are reporting on road and bridge closures, collisions, construction, reduced ferry service, low tides, and.

The Hood Canal Bridge Weekend Closures Will Be In The Middle Of The.

The bridge will be closed from 10 p.m.

โ€” The Hood Canal Bridge Is Expected To Be Closed Several Weekends This Summer, And Business Owners Are Worried It Could Impact The Local Economy.

Images References :

Construction Projects Will Affect The Flow Of Traffic On Sections Of Us 101 From Port Angeles And Sequim To Discovery Bay And South Of The Sr 104 Interchange.

30 each year, pleasure craft operators are prohibited from requiring a draw span opening from 3 p.m.

The Sr 104 Hood Canal Bridge Is Truly Unique.

This is a developing story,.

That Work Could Begin In Late 2025.